Vehicles Into Africa: Where the Damage Happens Between the Loading Ramp and the Buyer, and What the Record Has to Show
The highest volume claim trade on the continent, examined port by port. Handling damage, deck sweat and salt, missing parts, water ingress, lashing and chock failure, and the measurement that turns an argument about a scratch into a figure a claim handler can work from.
Eng. Daniel Esilaba, Cert CILA Technical and Operations, Observater Surveys and Services
How This Paper Should Be Read The Trade, and Why It Produces So Many Claims How Vehicles Are Damaged, in the Order It Happens Containers, Flat Racks and Knocked Down Units Telling One Stage From Another Reading the Documents That Came With the Unit The Three Wet Findings, and How They Differ Identity, Mileage and Substitution Questions Measurement, and the Figures a Claim Runs On The Record, Unit by Unit Reducing the Loss, Party by Party What Each Interest Needs From a Vehicle File Twenty-Four Ports, and What the Attendances Show Seven Disputes That Recur The Reports This Cargo Calls For What a Good File Looks Like on This Cargo Notice, Time and the Records That Expire Questions We Are Asked Before Every Vehicle Discharge Terms Used in This Paper Where We Attend, Country by Country
How This Paper Should Be Read This is a working paper on vehicles carried to and within Africa, drawn from attendances at vehicle terminals, container depots, bonded yards and corridor destinations. It describes what is commonly observed, the measurements a surveyor takes, and the practices that reduce loss. Findings on an individual shipment are made file by file, on the evidence at that attendance, which is what allows them to be relied on when a buyer, a carrier or an underwriter tests them.
The patterns set out here are indications recorded across many attendances. On a live file they are read together with the photographs, the measurements and the documents, and it is that combination that carries weight when the other side examines it. Whether a recorded condition amounts to damage, to a rejection, to a shortage or to a claim is decided against the sale contract, the contract of carriage and the policy. Those documents are applied to a dated record of what the unit actually was at each stage, and supplying that record is the work. Repair figures in this paper are illustrations of method. They are not values for any actual unit. We accept one appointment per matter, act for the interest that instructed us, and the findings reach that party first.
The Trade, and Why It Produces So Many Claims Africa imports more used vehicles than any other region. They arrive on car carriers, on multipurpose tonnage, in containers and on flat racks, are handled by hand more often than any other cargo, and are inspected at delivery by a buyer who has usually never seen the unit before. That combination produces claim frequency unlike anything else we attend.
Four features that no other cargo combines What makes vehicle claims different
Every unit is individually identifiable A chassis number makes each unit a separate cargo item with its own condition history. That is an advantage when the record exists and a problem when it does not, because a claim can be brought on one unit out of six hundred.
Damage is visible to a non-expert A buyer who cannot judge steel or fertiliser can see a scratch. Claim frequency therefore tracks what is visible rather than what is significant, and the survey record is what separates the two.
Units are driven, not lifted Most vehicle damage on a terminal is low speed contact caused during a movement, and units are moved several times between discharge and release.
Parts can be removed without a trace No other cargo can lose a quarter of its value without any external sign. Missing items are the largest single category in our vehicle damage registers.
What arrives, and in what condition it started Categories, and what each one is judged against
Used units from Japan, Singapore and the Gulf Sold with an export inspection certificate and an auction or grading sheet that already records existing damage. That sheet is the baseline, and the arrival record is compared to it rather than to a new vehicle standard.
Used units from Europe and North America Frequently sold without a grading sheet, and often with pre-existing damage that is not documented anywhere. Condition at loading is the only record that answers an arrival claim, and it is the one most often missing.
New units, factory to dealer Judged against a manufacturer’s tolerance, which is very tight. A mark that would pass unnoticed on a used unit is recorded and repaired here.
Salvage and accident damaged units Bought knowingly damaged and shipped for repair. The claim risk is the difference between the damage bought and the damage arrived, which cannot be established without a photographic set from origin.
Commercial vehicles, trucks and buses Often shipped part built or with bodies separate. Shortage of loose components and damage to protruding parts are the recurring findings.
Plant, agricultural and mining machinery Shipped with components removed and crated. The packing list is the document everything is checked against, and it is frequently incomplete.
Motorcycles and three wheelers Shipped in containers in large numbers, usually knocked down in cartons. Claims are shortage and carton damage rather than vehicle damage.
Electric and hybrid units Carry additional carriage conditions on state of charge and handling, and their condition on arrival includes the state of the traction battery, which is not visible.
A vehicle is the only cargo we attend that can lose a quarter of its value with nothing visible from ten paces.
How Vehicles Are Damaged, in the Order It Happens A unit passes through eight or nine handovers between the seller’s yard and the buyer. Damage is recorded at every one of them, and the mechanisms differ enough that they can usually be told apart.
At origin, before shipment Pre-existing damage that is either graded and disclosed or not disclosed at all. Units driven onto a trailer, stored in a compound, and washed before photography, which removes evidence of earlier condition as effectively as it removes dirt. Where no photographic set is made at origin, every later question about condition starts from nothing.
Loading Contact with the ramp, the deck lashing points and adjacent units. Damage to bumpers and sills as a unit crosses the ramp break. Lashing straps taken over body panels rather than over the tyre, which leaves a pressure mark that is often mistaken for handling damage.
On passage Movement in a seaway where lashings were tensioned once and never checked, producing repeated contact between units and between a unit and the deck structure. Condensation on vehicle decks, which forms on cold panels when warm humid air is admitted, and leaves water marks, mould in interiors and corrosion at panel edges. Salt, on units stowed on weather decks or on flat racks, and on any unit carried where sea spray reaches it. Water ingress through a window, sunroof or defective seal that was left open or unsealed at loading. Fluid leaks from one unit onto the unit below, which damages paint and interiors. Battery discharge and, on units left connected, drain to the point where the unit will not start at discharge, which is then reported as a fault rather than as a flat battery.
At discharge Driving damage on the ramp and on the terminal roadway, damage caused by pushing a unit that will not start, towing without the correct points, and contact in the discharge queue. On containerised units, damage during unstuffing is common, and it is caused by the same lack of clearance that caused damage during stuffing.
In the yard Dense parking with insufficient clearance, movement by staff who are not the same staff who recorded the condition, hail and sun damage on long dwell, standing water, and vegetation growth under stationary units. Interiors deteriorate quickly where a window has been left open, and mould in a humid port becomes a total interior strip rather than a clean.
Removal of parts Batteries, wheels, mirrors, lamps, head units, catalytic converters, spare wheels and tool kits. The pattern is consistent enough that a checklist at each handover is the only practical control, and the absence of such a list at any stage is what makes these claims difficult to place.
The removable items, and where they sit on the unit
batterymirrorroof rails
lampswheelswheels
Most often absent at delivery
Battery and its clamps
Spare wheel, jack and tool kit
Head unit, speakers, screen and camera
Mirrors, badges, wheel trims, alloy wheels
Fog lamps, indicator units, grille inserts
Catalytic converter and exhaust sections
Floor mats, headrests, cargo blind
Keys, spare key, service book, manuals
Where the list has to be signed
Export inspection, loading, discharge, port gate,
release to the buyer. Four dated lists turn a
dispute into a comparison.
The removable items that account for most of the value in our shortage registers.
On the corridor Transporter loading damage, contact between units on a two deck trailer, road stone damage, and units driven inland under their own power with no record of the condition at which they left. On the Northern, Central, Djibouti, Beira and Lobito corridors, a large proportion of the damage claimed as sea damage arose after the port gate.
At delivery Inspection by a buyer who compares the unit to an advertisement rather than to the sale terms, and who reports as new damage anything that was disclosed at auction. This is not fraud in most cases, it is the absence of a shared baseline.
Containers, Flat Racks and Knocked Down Units A large share of vehicle traffic into West and East Africa does not arrive on a car carrier. It arrives in general purpose containers, on flat racks, or as parts in cartons, and the claim profile changes with the packing.
Units in general purpose containers Two or three units are frequently loaded into a forty foot box on racking, or a single unit into a twenty. The damage recorded on unstuffing is caused by the same thing that caused it on stuffing, which is clearance. Mirrors left extended, aerials in place, doors not taped, and bracing timber that bears on a panel rather than on a wheel all leave marks that appear at the destination and are attributed to the voyage.
Clearance in a general purpose container, seen from the door
205 mm
205 mm
Internal width about 2,350 mm. Unit with mirrors extended 1,940 mm.
Checked before anything is moved
Seal number against the documents, doors closed
Bracing, chocks and wheel straps as found
Mirrors folded, aerial removed, doors taped
Contact marks on the container wall at unit height
Staining on the roof lining and on the floor
Position of each unit before it is driven out
Roof lining stained, floor dry
points to water that formed inside the box rather
than water that entered through the doors.
The dimension that decides most container vehicle claims, and the checks made before anything is moved.
The other mechanism is water. A sealed box loaded in a humid port and carried into cooler water condenses on the inside of the roof, and that water falls onto whatever is below it. On units this produces water marks on horizontal surfaces, mould in interiors where a window was left open, and corrosion at panel edges. Where the roof lining shows staining and the floor is dry, the water came from inside the box rather than through the doors.
Seals, and why they are photographed first The seal number is checked against the bill of lading and the packing list, and photographed before the doors are opened. A seal that does not match, or a box that has been opened and resealed, changes the whole shape of a shortage investigation, and it is the one fact that cannot be recovered once the doors are open.
Flat racks and open top Used for units too tall or too heavy for a box: trucks, buses, tractors and plant. Exposure to weather and salt is continuous, lashing is over the chassis rather than the wheels, and damage to protruding parts is the recurring finding. Tarpaulin failure on passage produces the same interior wetting that an open window produces on a car deck.
Knocked down units and motorcycles Motorcycles, three wheelers and small commercial units are shipped in cartons in large numbers. The claim is almost always shortage or carton damage rather than damage to a machine, and it is answered by a carton count against the packing list at unstuffing, with a tally of any carton that is open, crushed or short. Once cartons leave the depot mixed with other consignments, the count cannot be reconstructed.
Commercial vehicles, plant and machinery Trucks and buses are frequently shipped with bodies, mirrors, glass and lighting separate, and plant arrives with buckets, booms, counterweights and hydraulic hoses crated or loose. The packing list is the controlling document and it is frequently incomplete, so the first task is to establish what should be present before establishing what is. Loose components stowed apart from the machine are the items most often short at delivery, and they are recorded by piece rather than by parcel.
Telling One Stage From Another The value of a vehicle survey lies almost entirely in placing damage in time. Four kinds of evidence do that work.
Indications we record, and what they commonly point to
Rust in a fresh scratch A break in paint that has begun to rust has been open for some time. A bright, clean break is recent. Both are photographed close up with a scale.
Dirt in the damage Road film, dust or salt inside a dent or a scratch indicates the damage was there before the last cleaning or the last road movement.
Paint transfer and its colour Contact damage frequently carries paint from the object it struck. Colour and height above the ground narrow down what it met and where.
Height above the ground Damage at a consistent height across several units is associated with a fixed object at that height, which points to a place rather than to an event.
Consistency across a parcel Damage of one type across many units in one part of a deck points to something structural about the stow. Isolated damage on scattered units points to movement events.
Interior condition against exterior Mould and water marks inside a unit whose exterior is sound point to an opening rather than to an impact.
The grading sheet Where a Japanese or Gulf auction sheet exists, it is a dated record of condition at sale. Each arrival finding is checked against it before it is reported as new.
The pre-shipment inspection Where the importing country requires a roadworthiness or age inspection at origin, that certificate is a further dated record and is obtained as a matter of course.
None of these is treated as conclusive on its own. Read together, and set against dated records from origin, loading and the port gate, they place damage on a leg of the journey with enough precision for the parties to apply their contracts to it.
Reading the Documents That Came With the Unit Most used units arrive with paperwork that already describes their condition. A surveyor who reports arrival findings without reading it is producing half a document, and half a document is what keeps these disputes running.
The auction and grading sheet Units bought at Japanese, Korean and Gulf auctions carry a sheet prepared by an inspector at the point of sale. It normally carries an overall grade for the exterior, a separate letter grade for the interior, a diagram of the body with lettered marks against each existing defect, the mileage at inspection, and short notes in the inspector’s own hand.
What the marks on a sheet usually stand for
A A scratch. The number beside it indicates the scale, from a light mark to a long one.
U A dent, again with a number for size.
W A repaired or repainted area, which matters because a later paint reading will differ there.
S Rust, or corrosion, recorded at the point of sale.
C Corrosion of a heavier kind, on the same principle.
X and XX A part requiring replacement, or already replaced.
B A dent with a scratch through it.
Interior grades Usually a letter from A downward, covering upholstery, smell, burns and wear. A unit with a clean exterior grade can carry a poor interior grade.
We do not treat the sheet as an authority on the condition of the unit. We treat it as a dated record made by somebody else, and we say entry by entry whether an arrival finding matches one on it. Where a finding matches on position and description, that is recorded. Where it does not, that is recorded too. The comparison is the value, and it is the step that is almost always skipped.
Export and pre-shipment inspection certificates Several importing countries require an inspection at origin covering roadworthiness, age, emissions or radiation. Those certificates carry a date, an inspector and, frequently, photographs. Where one exists it is a second dated record of condition and it is obtained as a matter of course.
The bill of lading and the loading tally A vehicle bill of lading normally lists chassis numbers. The loading tally, where the carrier produced one, records the condition noted as each unit went aboard. Both are requested at the start of an attendance rather than at the end, because a remark on either changes what the arrival findings mean.
What we do when none of it exists Say so, plainly, in the report. A finding recorded at discharge with no origin document behind it is a finding at discharge and nothing more, and describing it as new damage would be a conclusion the evidence does not carry. What we can still do is fix the condition at a date, which is what protects whoever holds the unit next.
The Three Wet Findings, and How They Differ Water accounts for a large share of vehicle claims and almost all of the misdiagnosis. Three mechanisms produce three different pictures.
What the water did, and what it leaves behind
Rain or wash water through an opening Wetting concentrated below the opening. A window left ajar wets the seat and the carpet on that side. A defective sunroof drain wets the headlining and the pillars. The exterior is normally sound, and the seal or the opening is photographed as part of the finding.
Condensation, on deck or in a box Even, widespread light wetting on upward facing surfaces, water marks on horizontal panels, mould in interiors, and corrosion beginning at panel edges and around fixings. Where a container roof lining is stained and the floor is dry, the water formed inside the box.
Sea water Chlorides on the surface, salt residue in recesses, and corrosion out of proportion to the exposure time. Deck stowed units and units on flat racks are where this is found, and the residue is screened on site and quantified where the answer matters.
Flood damaged units, which are a separate question Units submerged before shipment arrive with their own signature: silt in the spare wheel well and under the carpets, a tide line inside the door shells, corrosion on unpainted bracketry under the dashboard, moisture in lamp units, and staining on seat belt webbing when it is pulled fully out. These are recorded specifically because they are the findings that distinguish a unit that was wet before it was shipped from one that was wetted on passage.
Mould In a humid port an interior moves from cleanable to strip and replace within weeks, so the date of the first record fixes the position. We record extent by surface, whether the smell is present with the doors closed, and whether the headlining, the seats and the carpet are affected separately, because those are three different repair operations.
Identity, Mileage and Substitution Questions We are regularly asked to address questions about the identity of a unit or about what has been changed on it. These are recorded as observations and measurements, and the report says what the evidence supports and where it stops.
Chassis number on the plate, on the body stamping and on the documents, photographed and compared. Where a plate is loose, refitted or absent, that is recorded as a physical observation rather than characterised. Odometer reading photographed at every attendance, and compared with the reading on the auction sheet and on the export certificate. Three dated numbers make the question answerable. Tyres recorded by make, size and tread depth, because tyres are among the items most frequently exchanged between units in a yard. Wheels recorded as alloy or steel, with any mismatch across the four noted. Battery recorded by make and date code where visible. Paint thickness readings where a repair or repaint is in question, taken panel by panel with the readings tabulated rather than summarised. Engine and transmission numbers where they can be reached, on units where the sale documents record them. Keys counted, and the number recorded at each handover.
None of these findings is presented as a conclusion about anybody’s conduct. They are measurements and photographs, and they are set out so that the parties, and where it goes that far a tribunal, can apply the contracts and the law to a record made at the time.
Measurement, and the Figures a Claim Runs On An adjective describing a scratch produces an argument. A measurement produces a figure. These are the calculations that carry a vehicle file.
1. Damage rate across a parcel Units discharged: 604
Units with a recorded finding: 71
Of which pre-existing on the grading sheets: 38
New findings recorded at discharge: 33
Rate = 33 / 604
5.5 per cent of units carried a new finding, against 11.8 per cent showing findings of any kind. Reporting both figures separates the condition of the parcel from the condition of the voyage.
2. Repair estimate, built line by line Labour: 4.2 hours at the local workshop rate of 18 per hour = 75.60
Paint: 1.5 panels at the local panel rate of 64 = 96.00
Parts: bumper cover, lamp unit and clips, dealer quotation = 184.00
Sundries and consumables = 22.00
377.60. Each line is sourced from a published operation time, a dated quotation or a named workshop rate, so that every figure can be checked by whoever reads the report.
How a repair figure is built, line by line
Labour 4.2 hrs at 18/hr75.60
Paint 1.5 panels96.00
Parts, dealer quotation184.00
Sundries and consumables22.00
Estimate total377.60
Every line carries its source
Labour hours from the published operation time
Rate from a named workshop, quoted in writing
Parts from a dated dealer or supplier quotation
Paint by panel count at the local panel rate
What it is set against
Sound arrived value at that place and date, from
three local comparables: 4,150
Proportion reported: 9.1 per cent
The thresholds in the policy are then applied to
figures nobody has to estimate a second time.
The build up, and the source behind each line.
3. Repair against sound arrived value Estimate: 377.60
Sound arrived value at that place and date, from three local market comparables: 4,150
Proportion = 377.60 / 4150
9.1 per cent. We report the estimate, the comparables and the proportion. The thresholds in the policy or the sale contract are then applied by the claim handler to figures that do not have to be estimated a second time.
4. Missing items, valued as a list Battery, replacement quotation: 92
Spare wheel, jack and tool kit: 168
Head unit and two speakers: 240
Two wheel trims: 46
Labour to fit: 1.5 hours at 18 = 27
573 on a unit whose exterior is undamaged. This is why a shortage checklist at every handover is worth more on this cargo than any amount of external photography.
5. Lashing, the transverse balance on a car deck Unit mass 1,450 kg. Transverse acceleration on a car deck amidships, take 0.5 g
Transverse force = 1,450 x 0.5 = 725 kg force, about 7.1 kN
Friction, rubber on a coated steel deck, take 0.7
Friction resistance = 0.7 x 1,450 = 1,015 kg force, about 10.0 kN
Friction alone exceeds the transverse force on a dry deck, which is why lashings on car decks are lighter than on other cargo. The moment the deck is wet, oily or the unit is on a sloped ramp, that margin disappears, and the four straps are carrying the load they were rigged for.
Four point lashing, and what fails first
Straps over the tyre, chocks at the wheel, 30 to 45 degrees to the deck
Failures we record
Strap over a body panel, leaving a pressure mark
Strap on a suspension arm, loading a component
Two point lashing on a unit that needs four
Webbing run over a sharp deck edge
Tension lost after the first heavy weather
Handbrake off, no gear engaged
Chocks absent or displaced
Clearance between units below the deck marking
What we photograph before anything moves
The strap as rigged, the chock in place, the deck
marking, and the unit either side.
Four point lashing, and the failures that recur.
6. Condensation on a vehicle deck Outside air 30 C at 85 per cent relative humidity, dew point about 27.3 C
Panel temperature measured at 21 C on units loaded in a temperate port
Panels are 6.3 C below the dew point of the air being admitted
Water will form on the panels while that air reaches them. The ventilation record shows what was admitted and when, which is why we ask for it before the units are moved.
7. Salt on the surface of a deck stowed unit Patch test area 12.5 cm2, extraction volume 15 ml
Chloride concentration measured 18 mg/l
Surface density = 18 x 0.015 / 0.00125
216 mg/m2. Read against the level at which corrosion is generally expected to continue after delivery, this is a figure that explains condition rather than merely asserting exposure.
8. Sample size on a large parcel Parcel of 1,180 units, condition survey rather than a claim
Instruction agreed at a 10 per cent sample, selected by taking every tenth unit off the ramp
Sample = 118 units, findings recorded on 9
Sample rate = 9 / 118
7.6 per cent within the sample, reported with the sample size and the selection method stated so that anybody reading it can judge what the figure covers. A sample rate is never presented as a count of the parcel.
9. Yard dwell and battery state Typical parasitic draw on a modern unit, 20 to 50 milliamps
Battery capacity 60 Ah, usable to about 50 per cent before starting becomes doubtful
At 35 mA the usable 30 Ah is consumed in 30,000 / 35 hours
About 857 hours, or 36 days. A unit that has stood for six weeks with the battery connected is expected not to start, which is a finding to record rather than a fault to diagnose.
10. Transporter loading, units per trip Two deck car carrier trailer, usable deck length 16.5 m over both decks
Unit length 4.3 m plus 0.3 m working clearance
Units = 16.5 x 2 / 4.6
Seven units, against the eight that are frequently loaded. The eighth is loaded by reducing clearance, and contact damage between units on the corridor is a foreseeable outcome of that decision. The loading arrangement is photographed at the gate for this reason.
8. Clearance in the stow Deck marked for a unit width of 1,820 mm plus 100 mm clearance each side
Units actually parked at 1,940 mm centres
Clearance available = 1,940 – 1,820
120 mm in total rather than 200 mm, which is 60 mm a side. Door contact damage across a row of units is a foreseeable outcome of that spacing, and the spacing is measurable after the event from the deck markings and the photographs.
9. Container stuffing, the same question in a box Internal width of a general purpose container about 2,350 mm
Unit width including mirrors 1,940 mm
Clearance = 2,350 – 1,940 = 410 mm, or 205 mm a side before racking or bracing
Enough for a single unit with careful bracing and nothing else. Two units abreast, or a unit with the mirrors left extended, is where the damage recorded on unstuffing begins.
The Record, Unit by Unit A vehicle attendance produces one line per unit and one photographic set per unit. Anything less cannot support a claim on an individual chassis number, which is how these claims are always brought.
Where a finding is located, and the code that carries it
123
45
FrontRear
Zone
1 Front bumper, grille, lamps, bonnet edge
2 Front wing, front door, mirror, front glass
3 Rear door, rear quarter, sill, rear glass
4 Rear bumper, tailgate, lamps
5 Roof, pillars, windscreen, sunroof
Recorded in three parts
Zone, then type, then severity with a measurement
2 / scratch / through paint, 60 mm
4 / dent / 25 mm across, paint intact
Kept on their own lines
Underside, interior, glass, tyres and missing items
are never folded into a body zone
The zone, type and severity coding used so that two surveyors describe the same damage the same way.
What each line carries Chassis number, make, model, year and colour, taken from the plate rather than from the manifest. Odometer reading, with the ignition on, photographed. Zone, type and severity of each finding, with a measurement in millimetres. Whether the finding appears on the grading sheet or the origin inspection, and if so under which entry. Missing items against the standard checklist, not as a general remark. Whether the unit starts, drives, steers and brakes, and whether it was moved under its own power. Battery condition and whether it was disconnected. Fluid levels and any leak, with the position of the leak on the ground photographed. Interior condition, including any water mark, mould or odour. Glass, lamps, mirrors and tyres, with tyre condition recorded because tyres are frequently substituted. Keys handed over, and how many.
The photographic set, taken the same way on every unit
1234
5678
Eight corners first, at the same distance
Then, on every unit, without exception
Chassis plate, with the number legible
Odometer, ignition on
Interior front and rear
Engine bay, battery visible
Boot, spare wheel and tool kit
Each finding, wide then close, scale in frame
Underside where the unit is lifted
The rule
The chassis number is photographed before the
damage, so every image ties to a line in the register.
The photographic set. Eight corners, then the fixed items, then each finding.
Where the record has to be made Five points, and a claim is usually decided by whichever of them was documented: at origin before loading, on loading, on discharge, at the port gate before the unit leaves the terminal, and on release to the buyer. Very few shipments have all five. Two well chosen ones, at origin and at discharge, answer most of what is later disputed.
Reducing the Loss, Party by Party
Before the unit is loaded A photographic set at origin, taken the same way on every unit, and kept with the sale file. Grading sheets and export inspection certificates obtained and filed at the time, not requested months later. A written condition and shortage checklist signed at handover to the carrier. Windows, sunroofs and vents closed and confirmed closed. Convertible tops secured. Fuel to the level the carrier requires and no more, battery secured, alarms disabled where the carrier asks for it. Loose items removed or listed. Anything left inside a unit is either lost or claimed for.
On the carriage Four point lashing over the tyres at the correct angle, chocks in place, handbrake applied and a gear engaged. Lashing tension checked after the first heavy weather and the check recorded. Ventilation to a rule, with a log, because deck sweat is the mechanism most often disputed and the log is the only evidence of what was done. Clearance between units maintained to the deck marking rather than to the number of units the deck can be made to hold.
Where the unit travels in a box Mirrors folded or removed, aerial removed, doors taped, and the loose items in one sealed bag listed on the packing list. Bracing against the wheels rather than against the body, with timber that cannot shift when the box is lifted. Wheel straps to the lashing rings, tensioned, with the handbrake applied and a gear engaged. Fuel to the level the line requires, battery disconnected where the carriage terms call for it, and the disconnection recorded. Desiccant where the route runs from a humid load port into cooler water, and the quantity noted. A photograph of the stuffed box before the doors are closed, with the seal number, which is the single most useful document on a containerised unit.
At discharge and in the yard A surveyor present at the ramp for the first units, so that the discharge condition is recorded before the terminal takes custody. Units that will not start moved by the correct method, not pushed by another unit. Parking to marked bays with clearance, on hard standing, away from standing water. A shortage checklist repeated at the port gate, signed by the driver taking the unit. Keys controlled and logged. Most missing part claims begin with uncontrolled keys.
On the corridor and at delivery A condition record at the port gate before the unit leaves, which is the single most useful document on a corridor shipment. Transporter loading photographed, with the position of the unit on the deck recorded. Delivery inspection against the origin set and the grading sheet, so that the buyer and the seller are looking at the same baseline.
Two dated records, one at origin and one at the port gate, answer more vehicle claims than any amount of argument after delivery.
What Each Interest Needs From a Vehicle File The same attendance is read by parties asking different questions. What follows is what each of them is deciding, and what we supply so that the decision rests on a dated record rather than on an exchange of assertions.
Cargo underwriters Frequency rather than severity drives this account. What helps is a parcel level picture as well as a unit level one: how many units carried findings, how many were pre-existing on the grading sheets, what the average repair figure is, and where in the journey the findings concentrate. We provide a first advice within 24 hours of attendance so reserves can be set, and a final report that gives both the unit lines and the parcel rate.
Marine and vehicle carriers, and their P&I clubs The exposure is a claim on delivery for damage the carrier may never have caused. Evidence gathered at loading and at the ramp is what answers it: condition on receipt, lashing arrangement photographed, ventilation record, and the discharge condition recorded before the terminal takes custody. We attend at short notice, report to the party who instructed us alone, and take no other appointment on the same shipment.
Terminals and stevedores The allegation is usually that the damage occurred inside the terminal. A dated ramp record and a gate record protect the operator as often as they expose one, which is why terminal operators instruct this work themselves.
Importers, dealers and fleet buyers The loss is a unit that cannot be sold at the price it was bought for. What protects the position is a condition record at discharge and again at the gate, a repair figure built from local quotations rather than estimated, and a shortage list that a supplier cannot dispute. Where a parcel is large, the parcel rate tells the buyer whether the problem is this shipment or this supply route.
Exporters, auction houses and traders The exposure sits at origin. A photographic set and a signed handover list, made the same way on every unit, is what allows an arrival claim to be answered instead of absorbed. Where we act at origin, that set is built to be read at the other end by someone who was not there.
Freight forwarders and NVOCC Liability attaches at handovers, and this cargo has more handovers than any other. Condition records at the handovers that matter allow a claim to be placed on the leg where it arose rather than on the party with the least documentation.
Transporters and corridor operators A unit driven or carried inland with no record of its condition at the gate is a claim waiting to be made. A gate record, and photographs of loading onto the transporter, are inexpensive and they settle most of what follows.
Banks and floor plan financiers Units under finance are security, and security in an open yard deteriorates and loses parts. We provide condition and quantity verification on arrival, and periodic checks against chassis numbers while stock is held, so that what is on the schedule is what is on the ground.
Recovery agents and adjusters The requirement is a file that survives challenge: one line per chassis number, photographs tied to those lines, repair figures with their sources, and a clear statement of what was compared against what. Where our figures differ from another surveyor’s, we say by how much and on what basis.
Lawyers Contemporaneous records, made and signed at the time by the person who made them, with the reasoning behind each figure visible in the file rather than only in the conclusion. We write on the basis that a report may be read out and questioned.
Manufacturers and distributors New vehicle tolerances are tight and a distributor’s reputation moves with them. Pre-delivery condition records, transit damage rates by route and by carrier, and consistent damage coding allow a distributor to see which leg of a supply chain is producing the cost.
Insurance brokers The interest is a client who is looked after within the hour when a vessel is discharging and something is wrong. We confirm the attending surveyor and the time before he travels, report to the party who instructed us and to nobody else, and give the broker a document that can be passed to the underwriter without being rewritten.
Salvage buyers and dismantlers Units bought damaged are bought against a description. The exposure is the difference between the damage described at sale and the damage present on arrival, and it is answered by a photographic set at origin and a matching set at discharge. Where parts have been removed between the two, the shortage list is what establishes it.
Shipping agents and consolidators An agent who releases a unit without a gate record inherits every allegation made afterwards. The record takes minutes per unit and it moves the question from an argument to a comparison.
What to send us Vessel or container numbers, the port, the number of units and the expected date. The bill of lading, packing or unit list, and any grading sheets or origin inspection certificates. Whether you need condition on discharge, condition at the gate, a repair figure, a shortage check, or all of them. Whether another interest is expected to attend, so a joint attendance can be arranged where it helps.
What comes back before anyone travels is the name of the attending surveyor, the time he will be there, and the fee in writing.
Twenty-Four Ports, and What the Attendances Show These notes are drawn from vehicle attendances at ports served by the group. They describe what recurs rather than what always happens, and they are written to be useful before a vessel arrives rather than after a claim is filed.
Mombasa, Kenya Kenya, Uganda, Rwanda, Burundi, South Sudan and eastern DRC are supplied through here. Units are driven off, held in port yards and bonded warehouses, then driven again to the corridor. Every additional drive is a movement that has to be recorded, and the findings that recur are low speed contact damage and missing removable items.
Dar es Salaam, Tanzania Very high used vehicle volumes for Tanzania, Zambia, Malawi, DRC and Burundi. Long dwell in open yards under a wet season is the exposure, and units left with windows or sunroofs ajar are where water ingress claims begin.
Djibouti The route into Ethiopia for both used units and new commercial vehicles. The corridor carriage is long and largely by transporter, and damage arising on that leg accounts for a large share of what is later attributed to the sea passage.
Berbera, Somalia Salt laden air and open storage. Units held for several weeks show corrosion starting at panel edges, wheel arches and unprotected brightwork, and the length of dwell is the figure that explains it.
Port Sudan Vehicles arrive alongside heavy general cargo and are stored on dusty ground. Fine dust in ventilation systems, on paint and inside door seals is a recurring finding, and it is the kind of condition that is disputed unless it was photographed at discharge.
Beira, Mozambique Units for Mozambique, Zimbabwe, Zambia and Malawi. Cyclone season rain, open yards and long clearing times combine, and interior wetting through a partly open window is the loss that recurs.
Maputo, Mozambique New vehicles for the local market and units in transit for South Africa and eSwatini. Handling is generally orderly, and the findings we record are concentrated at the transfer points between quay, yard and transporter.
Nacala, Mozambique Deep water and a long inland corridor to Malawi and Zambia. Condition at the port gate is the record that decides whether a claim belongs to the sea leg or the road leg.
Durban, South Africa The largest vehicle terminal on the continent, handling imports and a substantial export programme of locally built units. Volumes are high and processes are mature, so the disputes here are usually about a small number of units in a large parcel and are settled by the terminal gate record.
East London, South Africa An export terminal serving local assembly. The exposure runs the other way: units loaded here arrive elsewhere, and the condition record made at loading is the document that answers the arrival claim.
Ngqura and Port Elizabeth, South Africa Automotive manufacturing and component traffic alongside finished units. New vehicle claims turn on paint and panel condition where the tolerance is very small, and on the completeness of the pre-delivery record.
Walvis Bay, Namibia Units for Namibia, Botswana, Zambia and the southern DRC. Fog, cool humid air and salt make corrosion a live issue on units that stand for weeks, and the dew point record is what explains condition that looks worse than the dwell suggests.
Luanda, Angola New commercial vehicles, plant and used units, with long customs clearance. Cumulative handling damage across repeated movements inside the port area is the finding that recurs, rather than one identifiable incident.
Lobito, Angola The rail corridor to the copperbelt carries mining vehicles and plant. Loading and lashing on rail wagons is where damage is caused, and the wagon lashing points are the first thing we photograph.
Pointe-Noire, Republic of the Congo Humidity almost year round. Mould in interiors and condensation inside containerised units are more common findings than external damage, and both are frequently first noticed by the buyer rather than at the port.
Boma and Matadi, Democratic Republic of the Congo River ports with additional handling and barge movement. Each extra lift is a recorded opportunity for damage, and unit by unit identification by chassis number is what allows a claim to be placed.
Douala, Cameroon Vehicles for Cameroon, Chad and the Central African Republic. Congestion and long dwell in open storage, and battery removal and accessory loss are among the most frequent entries in our damage registers here.
Lagos, Tin Can Island and Apapa, Nigeria Very high volumes of used units and containerised vehicles. Handling intensity is high and units are moved repeatedly before release, which produces contact damage that no single party is recorded as having caused unless the movements were documented.
Cotonou, Benin One of the largest used vehicle entry points on the continent, feeding Niger, Burkina Faso, Mali and northern Nigeria. Units are stored in dense rows in open yards for long periods, and the parts most easily removed are the ones most often absent at delivery.
Lome, Togo A transhipment and distribution hub. Units are discharged, held and reloaded, and damage sustained between those legs cannot be placed without a record at each one.
Tema, Ghana Used and new units for Ghana and the Sahel corridor. Rainy season storage in open yards, and interior wetting on units with defective seals or open glass, are the recurring findings.
Abidjan, Ivory Coast High volume, mixed used and new, with onward movement to Mali and Burkina Faso. Repeated lifting and driving inside the port produces the cumulative low speed damage that dominates the registers.
Dakar, Senegal Units for Senegal and the Malian corridor. Salt exposure in open storage and handling damage at the transfer to transporters are what we record most often.
Conakry, Guinea Mining vehicles and plant alongside used units. Plant arriving partly dismantled, with components shipped loose, is where shortage and damage claims begin, and the packing list is the document everything is checked against.
Seven Disputes That Recur
The argument, and the record that decides it in practice
It was already damaged when you bought it The grading or auction sheet, read against the arrival findings entry by entry. Most of this argument disappears once the two documents are put side by side.
The terminal did it The ramp record and the gate record. Two dated sets, taken hours apart, place the damage inside or outside the terminal without anyone having to concede a point.
The parts were missing when it arrived A shortage checklist at each handover. Without one, the loss falls on whoever handled the unit last and can prove least.
It is water damage from the sea The position of the water inside the unit, the state of the seals, glass and sunroof, and the salt test on the residue. Interior wetting with sound exterior and a defective seal points somewhere different from spray on a deck stowed unit.
The unit will not start, so the engine is damaged Battery condition and voltage recorded at the attendance, and whether the unit was left connected. A discharged battery and a damaged engine are not the same finding and are not recorded as if they were.
The damage is not worth repairing A repair estimate built from local quotations, and the sound arrived value from comparables, both reported with their sources so the proportion can be applied under the policy.
The odometer has been altered The reading photographed at each attendance, the auction sheet reading, and the reading at delivery. Three dated numbers make the question answerable rather than suspected.
The Reports This Cargo Calls For
Report, and when it is the right one to order
Pre-shipment condition survey At origin, before loading. One photographic set and one condition line per unit. The document that makes every later question answerable.
On hire and off hire vehicle deck survey Deck condition, lashing arrangement, ventilation capability and stow markings, for carriers and charterers.
Discharge condition and out-turn Unit by unit at the ramp, with the parcel rate and the shortage checklist.
Gate and pre-delivery condition record At the terminal exit and again on release to the buyer, which is what separates port damage from corridor damage.
Damage and repair assessment Findings, causation evidence where instructed, and a repair figure with its sources.
Stock condition and count Periodic verification of units held in a yard or under finance, against chassis numbers.
Two of these are worth ordering when nothing has gone wrong. The pre-shipment set and the gate record cost a fraction of a single repair claim, and neither can be recreated afterwards.
What a Good File Looks Like on This Cargo The strength of a vehicle file is not the length of the report. It is whether a person who was never there can follow one chassis number from the seller’s yard to the buyer’s gate and see what changed at each stage.
The eight elements, in the order a reader uses them
A parcel summary on one page Units discharged, units with findings, units with findings already recorded at origin, the parcel rate, and the shortage summary. This page is what a claim handler reads first and often all they need.
One line per chassis number Coded findings with measurements, cross referenced to the grading sheet entry where one exists.
A photographic set per unit The same eight corners, the same fixed items, in the same order, so that two units can be compared without allowance for how they were photographed.
A shortage checklist per unit Signed at the handover it was made at, naming the person who signed it.
The dated records from the other stages Origin set, ramp record, gate record, and any terminal record obtained, so the comparisons are in the file rather than in the surveyor’s memory.
Repair figures with their sources Operation times, workshop rate, dated parts quotations, panel count.
The stow and lashing evidence Deck photographs, lashing arrangement, clearance measured off the deck markings, ventilation record where sweat is in issue.
A statement of what the evidence does not establish Written plainly. A report that says where its evidence stops is the one that holds when the other side reads it closely.
Notice, Time and the Records That Expire
What is running while a unit sits in a yard
Notice to the carrier Damage that is apparent is notified at or before removal, and damage that is not apparent within the period allowed under the carriage terms. Late notice does not end a claim, but it shifts the burden onto the party bringing it.
Time bar Suit against a carrier is commonly barred one year from delivery under the carriage regime applied. Extensions are granted routinely and have to be asked for.
Terminal custody Once a unit leaves the gate, the terminal record closes. Anything not recorded before that point is argued afterwards.
Repair A unit repaired before it is surveyed cannot be surveyed. Where repair cannot wait, a photographic set and an itemised estimate before work starts preserve the position.
Deterioration Interiors in a humid port move from cleanable to strip and replace in weeks. The date of the first record is what fixes the condition.
Questions We Are Asked Before Every Vehicle Discharge
Do you survey every unit or a sample? Whichever the instruction calls for. On a claim we survey every unit named. On a large parcel for condition purposes, a sample is agreed in writing with the party instructing us, and the sample size and the method of selection appear in the report.
A scratch is on the auction sheet but the buyer says it is new. What then? We photograph the finding, locate it by zone, and set it against the entry on the sheet. Where the two match on position and description we record that. Where they do not, we say so. The comparison is what the parties then apply their contract to.
How do you value a repair when there is no dealer in the country? From a named independent workshop rate, published operation times, and parts quotations from the nearest source that can actually supply, with the freight to bring the part in shown separately. Every line is sourced so it can be checked.
Can you prove when the parts went missing? Only to the extent the handover records allow. Where a checklist exists at each stage, the answer is usually clear. Where none exists, we record what is absent and when we first saw the unit, and we say plainly what the evidence does and does not establish.
The unit will not start. Is that a claim? It is a finding, and it is recorded as one, with the battery voltage, whether the battery was connected, and whether the unit was stored for a long period. Whether it becomes a claim depends on the sale and carriage terms applied to that record.
Is deck sweat the carrier’s responsibility? That question is answered against the carriage terms and the ventilation record. Our part is the physical evidence: panel temperatures, dew points, where the water formed, and what the ventilation log shows was done.
How long does a survey of 400 units take? One to two days for a full unit by unit set with photographs, depending on the terminal layout and the discharge rate, with more than one surveyor where the discharge is fast. We confirm the number of surveyors and the time before we travel.
Can you attend at the export end as well? Yes, and on a route producing repeated claims it is the better spend, because it creates the baseline the arrival record is compared against.
Do you handle electric and hybrid units differently? Yes. State of charge on arrival, evidence of any charging during storage, physical condition of the battery enclosure and any warning indication are recorded, and any handling restriction stated by the carrier is noted.
The container seal was intact but items are missing. What does that tell you? That the loss did not occur through the doors after sealing. It moves attention to the stuffing stage and to the packing list, and it is why the seal is photographed and checked against the documents before the doors are opened.
Can you survey units that have already been released to buyers? We can attend and record what is present, and we say plainly that the record begins at that date. Condition before release is then a matter of whatever documents already exist, which is why the gate record matters so much on this cargo.
Do you provide repair estimates or only condition? Both, where instructed. The estimate is built from published operation times, a named workshop rate and dated parts quotations, and every line shows its source.
How do you handle a parcel where the buyer claims on almost every unit? By surveying every unit named, coding the findings the same way, and reporting the parcel rate alongside the individual lines. A parcel level figure usually shows very quickly whether the pattern is a voyage event, a terminal event or a difference of expectation.
Will you attend at night or over a weekend? Vehicle discharges run around the clock and we attend accordingly. The number of surveyors and the shift pattern are confirmed in writing before we travel.
What single thing would reduce our claims most? A photographic set at origin, taken the same way on every unit, and a signed condition record at the port gate. Between them they answer most of what is disputed at delivery.
Terms Used in This Paper
Working definitions
Grading sheet The auction or seller’s condition sheet accompanying a used unit, recording existing damage at the point of sale.
Zone, type, severity The three part coding used to describe a finding so that two surveyors record the same damage in the same terms.
Ramp record The condition record made as units cross the ramp at loading or discharge.
Gate record The condition record made as a unit leaves the terminal.
Deck sweat Condensation forming on cold vehicle panels when warmer humid air reaches them.
Sound arrived value The market value of the unit in sound condition at the place and date of arrival, taken from comparables and used as the denominator for a repair proportion.
Operation time The published labour time for a repair operation on that model, used instead of an estimated duration.
Shortage checklist The standard list of removable items checked and signed at each handover.
Unit line One row in the damage register, tied to one chassis number.
Parcel rate Units with findings as a proportion of units discharged, reported alongside the individual lines.
Where We Attend, Country by Country The ports named in this paper are covered by the desks below. Each one carries the local detail for the place: the terminals worked, the corridors served, and the way an instruction is taken.
Instructions for any of these places are taken on one line, and attendance is confirmed in writing before work begins.
One Scratch on One Chassis Number Becomes a Claim. Six Hundred Units With No Record Becomes a Loss Nobody Can Place Importers and dealers carry the unit that cannot be sold at the price it was bought for. Exporters and auction sellers carry the arrival claim they have no origin set to answer. Carriers and their clubs carry damage they may never have caused, on a deck nobody photographed. Terminals carry the allegation when no ramp record and no gate record exist. Transporters carry the corridor damage that was never separated from the sea damage. Underwriters carry a frequency they cannot analyse because the findings were never coded. Banks carry stock that is losing parts while it stands. Whichever seat you hold, send the vessel or container numbers, the port, the number of units and the date. What comes back is the name of the attending surveyor, the time he will be there, and the fee in writing. One interest per matter: when we take your appointment we act for your side only, and the findings reach you first.